Act on gaps
In the loop, a gap becomes campaign work, and the work gets re-measured on the same prompts.
Which gaps to take
Rank by decision impact, not by how far behind you are.
| Take first | Leave |
|---|---|
| Comparison prompts where a competitor is cited and you are not | Broad category prompts where many vendors are all named |
| Pricing and evaluation prompts with a clear factual answer | Prompts whose answers are opinion pieces |
| Prompts with high coverage and low visibility: the page exists, the citation does not | Prompts nobody in your pipeline has ever asked |
| Anything a rep has heard a buyer say out loud | Anything only a tool suggested |
From gap to work
Scan first, so you have a baseline
trigger_scanbefore you publish. See Track Your Brand.Brief with the prompt and the sources
Hand the content app the prompt text, the competitors currently cited, and the cited sources.
Write the claim plainly and early
Answer engines quote sentences. Put the claim near the top, and write it so it still makes sense when it is quoted on its own.
Fix the sources you control in parallel
Directory listings and review-site descriptions are yours to edit. Start there.
Re-scan more than once
Pick the re-scan dates before you publish, so you are not choosing them after seeing a number you like. Models do not all move at the same time, and a single scan is a single sample. Compare each against the baseline, per model.
What to expect
Uneven movement. The models do not move together. That is what the per-model breakdown is for.
Occasional regressions. Answers change on their own. Read trends, not points.
Close the loop on revenue
Visibility is a leading indicator. Two things connect it to pipeline:
get_ai_traffic_sourcesattributes AI referrals by engine, so you can compare how those visitors convert against organic ones.- The conversion funnel carries them through to qualified leads and meetings.
SAM reaches the visibility data, so a question about whether you show up in AI answers for a named prompt works from Slack, and a schedule can post it weekly.